Knowledge

8 November 2026

Writing a quote as an electrician: what it must contain, how long it binds you and how to fix the price

A quote is legally an offer to contract and binds you while its deadline runs. What belongs in it, how to set the validity with a date and which price form to choose.


A quote (in German: Offerte) is legally an offer to conclude a contract: if the customer says yes, the contract exists, at your price. The law prescribes no content, but three things decide in a dispute what you promised — the deadline you named, the price form and the description of the work. Leave them out and you stay bound longer than you meant to, or you explain later what was "included".

What a quote is — and how long it binds

A quote is the offer by which a business puts work and price to the customer for acceptance; legally it is an offer under Art. 3 ff. of the Code of Obligations (OR). If the customer accepts, the contract for work is concluded: the contractor undertakes to produce the work, the customer to pay the price (Art. 363 OR).

How long you are bound depends on whether you set a deadline:

  • With a deadline, you stay bound until it expires; if the acceptance has not reached you by then, you are free again (Art. 3 OR).
  • Without a deadline, to someone present — by phone too — the quote binds only if the customer accepts at once (Art. 4 OR).
  • Without a deadline, to someone absent, so a quote by post or e-mail, you stay bound until you can expect a reply sent properly and on time (Art. 5 para. 1 OR). How many days that is, the law does not say — it depends on the case, which is exactly what a deadline avoids.
  • With a reservation: you are not bound if you attach a statement declining to be held to it, or if the reservation follows from the nature of the deal or the circumstances (Art. 7 para. 1 OR). Sending tariffs or price lists is not in itself an offer (Art. 7 para. 2 OR).

So put a date on the quote, not "30 days from receipt": "This quote is valid until 7 December 2026." A date leaves no argument about when counting starts.

What belongs on a quote

The law has no minimum content for a quote (unlike for the invoice). In practice, what belongs is what prevents a dispute later:

  1. Customer and object — who orders, and where the work takes place. For property managers: the object's address, not only the billing address.
  2. A description of the work that says what you do — and what you do not. "Replace distribution board" is not a service; "replace 24-module sub-board, reconnect circuits, measurement and safety certificate" is.
  3. Positions with quantity, unit and price, split into material and labour. That way you can say later where an overrun arose.
  4. The price form: fixed, approximate (cost estimate) or Regie (time and materials) — see the next section.
  5. Work not included: chasing, painting, scaffolding, permits, removing old equipment. What is not written there is usually claimed afterwards.
  6. The validity with a date and, if needed, a note that the price may change if material prices move or if the work is carried out after a certain date.
  7. Payment terms: Akonto, payment period, Skonto — see the articles «Payment on account for an electrical contractor» and «Skonto (cash discount): meaning, calculation and deduction».
  8. VAT: whether prices include or exclude value added tax. A price that leaves this open is read by the customer as the final price.

What does not belong is what only makes the quote longer — advertising copy, company history, terms and conditions in small print the customer never saw.

The price form decides what applies to extra cost

The three price forms have different consequences under the Code of Obligations. The details are in the article «Quote variation: fixed price, estimate or Regie»; here is the short version for the moment you write the quote:

  • A cost estimate is an approximate price agreed with the customer. If that figure is exceeded disproportionately without the customer's doing, the customer may withdraw from the contract — during and after the work (Art. 375 para. 1 OR). For buildings on the customer's land, the customer may instead demand an appropriate reduction of the price (Art. 375 para. 2 OR). So write "approximately" only when you mean it, and name a ceiling or the uncertainty you see.
  • If the price was not fixed, or only roughly, it is set according to the value of the work and the contractor's expenses (Art. 374 OR). That is the basis of Regie: you bill what you can prove. Without a signed rapport this is hard; see «Getting the Regie rapport signed».
  • A fixed price names a firm sum for a precisely described service. It protects the customer from extra cost — and you from renegotiation, as long as the description is clear. An unclear description is the most common reason a fixed price turns into a fight over variations.

How a price arises from a position is shown in «NPK costing for an electrical contractor».

Example: sub-board in a detached house

Assumed figures: hourly rate CHF 105.00. The quote is written on 9 November 2026, valid for four weeks.

Pos.ServiceQuantityPrice
124-module sub-board, materiallump sumCHF 1'480.00
2Circuit breakers, residual-current devicelump sumCHF 1'115.00
3Installation and wiring18 hCHF 1'890.00
4Measurement, safety certificate3 hCHF 315.00
Total excl. VATCHF 4'800.00
VAT 8.1 %CHF 388.80
Total incl. VATCHF 5'188.80

Below it: "Fixed price for the service described. Not included: chasing and painting, disposal of the old board. This quote is valid until 7 December 2026. Payment 30 days net." Three sentences, and the three points of dispute — price form, validity and scope — are settled. (The VAT rate is the standard rate used in the example; check the rate that applies to your service.)

After the quote: acceptance and order

Acceptance need not be in writing, but you want it in writing: a signed quote or an e-mail "We accept". Only then are price and scope proven before material is ordered. Whoever starts without acceptance works at their own risk: the customer can claim they only asked for a price. What belongs in the confirmation you send afterwards is covered in «Order confirmation for an electrical contractor».

If a quote goes unanswered, a follow-up before the deadline is worth it — after it you are free, but without an order.

How elektro.box handles the quote

Quote, rapport and invoice are the same Beleg with a different kind, so also the same editor. What the customer sees, they see through a link and sign on whatever device they have in hand. The page Quote, rapport, invoice shows how it fits together.

Common questions

What must a quote contain? The law prescribes no minimum content. Useful are customer and object, a description of the work including what is excluded, positions with prices, the price form, the validity with a date, the payment terms and whether prices include VAT.

How long is a quote valid? As long as you write. If you set a deadline, you are bound until it expires (Art. 3 OR). Without one, for a quote by e-mail, the period in which a reply may be expected applies (Art. 5 OR) — a period the law does not put in numbers.

Is a quote binding? Yes, as long as you do not decline to be held to it and the deadline runs. With a reservation such as "without obligation" you are not bound (Art. 7 para. 1 OR). A price list is not in itself a quote (Art. 7 para. 2 OR).

What is the difference between a quote and a cost estimate? A quote is the offer with a price for acceptance. A cost estimate is a quote with an approximate price. If it is exceeded disproportionately without the customer's doing, the customer may withdraw (Art. 375 OR).

Can I still change the quote after acceptance? Not unilaterally. After acceptance the contract applies; extra work is requested through a variation, ideally before it is carried out. How, the article «Quote variation» explains.

Related articles


Sources: Swiss Code of Obligations (OR, SR 220), Art. 3, 4, 5, 7, 363, 374 and 375, fedlex.admin.ch, version of 1 January 2024, retrieved on 8 November 2026. The figures in the example are assumed. This article is not legal advice: whether an overrun is "disproportionate" or a reservation suffices is decided by the court in each case.

Would you rather see it on your own business straight away?

We look at a real week from your business — 45 minutes, at your place or on screen.