8 November 2026
A quote is legally an offer to contract and binds you while its deadline runs. What belongs in it, how to set the validity with a date and which price form to choose.
A quote (in German: Offerte) is legally an offer to conclude a contract: if the customer says yes, the contract exists, at your price. The law prescribes no content, but three things decide in a dispute what you promised — the deadline you named, the price form and the description of the work. Leave them out and you stay bound longer than you meant to, or you explain later what was "included".
A quote is the offer by which a business puts work and price to the customer for acceptance; legally it is an offer under Art. 3 ff. of the Code of Obligations (OR). If the customer accepts, the contract for work is concluded: the contractor undertakes to produce the work, the customer to pay the price (Art. 363 OR).
How long you are bound depends on whether you set a deadline:
So put a date on the quote, not "30 days from receipt": "This quote is valid until 7 December 2026." A date leaves no argument about when counting starts.
The law has no minimum content for a quote (unlike for the invoice). In practice, what belongs is what prevents a dispute later:
What does not belong is what only makes the quote longer — advertising copy, company history, terms and conditions in small print the customer never saw.
The three price forms have different consequences under the Code of Obligations. The details are in the article «Quote variation: fixed price, estimate or Regie»; here is the short version for the moment you write the quote:
How a price arises from a position is shown in «NPK costing for an electrical contractor».
Assumed figures: hourly rate CHF 105.00. The quote is written on 9 November 2026, valid for four weeks.
| Pos. | Service | Quantity | Price |
|---|---|---|---|
| 1 | 24-module sub-board, material | lump sum | CHF 1'480.00 |
| 2 | Circuit breakers, residual-current device | lump sum | CHF 1'115.00 |
| 3 | Installation and wiring | 18 h | CHF 1'890.00 |
| 4 | Measurement, safety certificate | 3 h | CHF 315.00 |
| Total excl. VAT | CHF 4'800.00 | ||
| VAT 8.1 % | CHF 388.80 | ||
| Total incl. VAT | CHF 5'188.80 |
Below it: "Fixed price for the service described. Not included: chasing and painting, disposal of the old board. This quote is valid until 7 December 2026. Payment 30 days net." Three sentences, and the three points of dispute — price form, validity and scope — are settled. (The VAT rate is the standard rate used in the example; check the rate that applies to your service.)
Acceptance need not be in writing, but you want it in writing: a signed quote or an e-mail "We accept". Only then are price and scope proven before material is ordered. Whoever starts without acceptance works at their own risk: the customer can claim they only asked for a price. What belongs in the confirmation you send afterwards is covered in «Order confirmation for an electrical contractor».
If a quote goes unanswered, a follow-up before the deadline is worth it — after it you are free, but without an order.
Quote, rapport and invoice are the same Beleg with a different kind, so also the same editor. What the customer sees, they see through a link and sign on whatever device they have in hand. The page Quote, rapport, invoice shows how it fits together.
What must a quote contain? The law prescribes no minimum content. Useful are customer and object, a description of the work including what is excluded, positions with prices, the price form, the validity with a date, the payment terms and whether prices include VAT.
How long is a quote valid? As long as you write. If you set a deadline, you are bound until it expires (Art. 3 OR). Without one, for a quote by e-mail, the period in which a reply may be expected applies (Art. 5 OR) — a period the law does not put in numbers.
Is a quote binding? Yes, as long as you do not decline to be held to it and the deadline runs. With a reservation such as "without obligation" you are not bound (Art. 7 para. 1 OR). A price list is not in itself a quote (Art. 7 para. 2 OR).
What is the difference between a quote and a cost estimate? A quote is the offer with a price for acceptance. A cost estimate is a quote with an approximate price. If it is exceeded disproportionately without the customer's doing, the customer may withdraw (Art. 375 OR).
Can I still change the quote after acceptance? Not unilaterally. After acceptance the contract applies; extra work is requested through a variation, ideally before it is carried out. How, the article «Quote variation» explains.
Sources: Swiss Code of Obligations (OR, SR 220), Art. 3, 4, 5, 7, 363, 374 and 375, fedlex.admin.ch, version of 1 January 2024, retrieved on 8 November 2026. The figures in the example are assumed. This article is not legal advice: whether an overrun is "disproportionate" or a reservation suffices is decided by the court in each case.
We look at a real week from your business — 45 minutes, at your place or on screen.