Installation and certificate
The values are captured at the circuit, on site, instead of going through the keyboard a second time in the evening. Which certificates an order needs, elektro.box proposes.


What you do with it
An installation dossier with circuits and measurement runs, the measurement protocol as a PDF. Erstprüfung, Schlusskontrolle, Abnahmekontrolle and periodic inspection each have their own procedure.
The SiNa on the VSE 2018 form as PDF/A, by email to the grid operator and with the hand-over to the owner. Whoever did the work may not sign it off — independence under NIV Art. 33.
Whether a notification is required, by questionnaire; connection request, installation notice and meter order, with versions. Queries from the grid operator become tasks, and the file closes only once everything is there.
Inspection periods under the NIV, permits and the EIV deadline in the deadline monitor. Defects come straight out of the measurement run, with photos and offline too.
Everything in this area
Related articles
45 minutes using one of your jobs: from capture on site through to the certificate and invoice.