Scheduling
The day is on the map rather than in a column: who is working, where the sites are and how long it takes to get between them.

What you do with it
Who is working, who is away, and which Rapporte with no date are waiting in «Not scheduled». Work that spans several days is planned here too, and an assignment can be cleared again.
The route for each Monteur is on the map, with the measured driving times between the sites. The deadline and the double booking show up where you plan.
«Optimise day» proposes an order of visits and takes qualifications and «Has been there before» into account. The proposal is only adopted when you apply it.
The Monteur sees his day as a map; a tap opens Google Maps with the next address.
Everything in this area
Matching integrations
45 minutes using one of your jobs: from capture on site through to the certificate and invoice.