All features

Installation and certificate

Measurement protocol, safety certificate and notifications in one dossier

The values are captured at the circuit, on site, instead of going through the keyboard a second time in the evening. Which certificates an order needs, elektro.box proposes.

Installations
The installations in elektro.box, with circuits and the next inspection per installation
Grid filings of an order
The grid filings tab of an order in elektro.box: installation notice, connection request, meter order and safety certificate, with the state of each step

What you do with it

Measure, certify, bring forward

  • Measuring at the circuit

    An installation dossier with circuits and measurement runs, the measurement protocol as a PDF. Erstprüfung, Schlusskontrolle, Abnahmekontrolle and periodic inspection each have their own procedure.

  • The safety certificate

    The SiNa on the VSE 2018 form as PDF/A, by email to the grid operator and with the hand-over to the owner. Whoever did the work may not sign it off — independence under NIV Art. 33.

  • Notifications step by step

    Whether a notification is required, by questionnaire; connection request, installation notice and meter order, with versions. Queries from the grid operator become tasks, and the file closes only once everything is there.

  • Deadlines and defects

    Inspection periods under the NIV, permits and the EIV deadline in the deadline monitor. Defects come straight out of the measurement run, with photos and offline too.

Everything in this area

  • Installation dossier
  • Circuits
  • Measurement runs
  • Measurement protocol as a PDF
  • Erstprüfung
  • Schlusskontrolle
  • Abnahmekontrolle
  • Periodic inspection
  • SiNa on the VSE 2018 form, as PDF/A
  • SiNa to the grid operator by e-mail
  • Hand-over to the owner
  • Sample inspection
  • Which certificates an order needs
  • The notification process step by step
  • Whether a notification is required, by questionnaire
  • Connection request, installation notice and meter order, with versions
  • Queries from the grid operator as a task
  • A prefilled sheet for the grid operator, as a PDF
  • Independence under NIV Art. 33
  • Inspection periods under the NIV
  • Permits and their deadlines
  • Defect report
  • Defects straight out of the Messung
  • Defects with photos, offline too
  • Deadline extensions from the inspection body by e-mail
  • Your own defect templates
  • Deadline monitor
  • Look up the grid operator
  • The EIV deadline for the one-off payment
  • Send the SiNa and the protocol with the invoice
  • The file closes only once everything is there
  • The building's life record

Better seen than read

45 minutes using one of your jobs: from capture on site through to the certificate and invoice.