Regie work is billed by actual effort, not at a fixed price. The Swiss Code of Obligations does not know the word, but Art. 374 CO says what applies when no price, or only an approximate one, was agreed. What to agree beforehand, how a Regie price is built from hours, material and travel, and what happens when the indicative price is exceeded.
Regie work is work that is billed not at a price fixed in advance but by actual effort: hours, material, travel. The word «Regie» is not in the Code of Obligations; the legal basis is Art. 374 CO. If the price was determined in advance neither at all nor approximately, it is set according to the value of the work and the contractor's expenses. Anyone who wants to bill Regie therefore agrees the hourly rate and the rules for material and travel beforehand, and then documents every hour with a Rapport.
Regie is the pricing form for work whose extent cannot be fixed beforehand: the fault that only makes sense once the Verteiler is opened, the conversion of an existing installation, the small extra job during an installation. It is the opposite of the lump sum: with a lump sum the firm carries the risk of quantity; with Regie the client does.
Work for which a fixed price was agreed is not Regie, even if it ends up taking longer. The law is clear: where the remuneration was determined exactly in advance, the contractor must complete the work for that sum and may not demand an increase, even if he had more work or greater expenses than foreseen (Art. 373 para. 1 CO). Only extraordinary circumstances that nobody could have foreseen allow the judge to grant an increase (Art. 373 para. 2 CO). Anyone who wants to bill extra work on a lump-sum contract by effort needs a variation, ideally before the work is done — see «Quote variations: fixed price, cost estimate or Regie».
A Regie price has three parts, and for each: what you agreed beforehand applies; what you did not, you must justify as an expense in a dispute.
An example with assumed figures: two fitters work 3.5 hours each on a fault in the Verteiler, agreed rate CHF 105.00 an hour. The material used cost CHF 180.00 at purchase, agreed surcharge 10 %. A flat rate of CHF 45.00 is agreed for travel.
| Item | Calculation | Amount |
|---|---|---|
| Working time | 2 × 3.5 h × CHF 105.00 | CHF 735.00 |
| Material | CHF 180.00 + 10 % (CHF 18.00) | CHF 198.00 |
| Travel | flat rate | CHF 45.00 |
| Total | CHF 978.00 |
Amounts exclude VAT. The figures are assumed, not benchmarks: which rates and surcharges are usual or appropriate is a matter for costing and agreement.
A Regie agreement need not be long, but it must exist — in the quote, in the order confirmation or in the general terms the quote refers to:
With Regie the Rapport is the evidence for the price. It records who did what, when, for how long and with what material. A Rapport signed on site by the client makes the proof considerably easier; what belongs in it and what the signature achieves is covered in «Getting the Regie Rapport signed».
The invoice takes hours, material and travel from the Rapport, with the date and place of the work. Unless agreed otherwise, remuneration falls due on delivery of the work (Art. 372 para. 1 CO). What an invoice must contain and how Regie, lump sum and Akonto appear on it is covered in «Invoicing as an electrician: QR, Regie, Akonto». The time recording behind it is described in «Timesheet for an electrical contractor».
In elektro.box the Regie Rapport is created on the phone and signed on site, and the invoice carries Regie alongside lump sum, Akonto and retention, with a QR bill. This is described under Invoicing.
If an approximate figure was named and it is exceeded disproportionately without the client's doing, the client has the right to withdraw from the contract, both during and after execution (Art. 375 para. 1 CO). For buildings on the client's land the client may instead demand an appropriate reduction of the fee or, if the building is not yet complete, withdraw the contractor's right to continue, against fair compensation for the work already done (Art. 375 para. 2 CO).
What «disproportionate» means the law does not say; the court decides in each case. One practical consequence: tell the client about the overrun before it happens, not on the invoice. Whoever informs beforehand and has the continuation confirmed removes the client's reason to withdraw, and spares themselves the dispute.
What is the difference between Regie and a lump sum? With a lump sum the remuneration is determined exactly in advance and the firm may not demand an increase even if it had more work (Art. 373 para. 1 CO). With Regie the price follows actual effort (Art. 374 CO).
May I bill Regie if nothing was agreed? Yes: if the price was not agreed, it is set according to the value of the work and your expenses (Art. 374 CO). You must however justify the effort, and without an agreed rate the amount of the «value of the work» is easier to dispute.
How many hours may I bill? Those actually worked and necessary for the job. The Rapport documents them; a signed Rapport makes it harder for the client to dispute them later.
What applies if the indicative price is clearly exceeded? If the effort exceeds an approximate figure disproportionately and without the client's doing, the client may withdraw from the contract (Art. 375 para. 1 CO). So inform the client before the indicative price is reached.
Sources: Swiss Code of Obligations (CO, SR 220), Art. 372, 373, 374 and 375, fedlex.admin.ch, version of 1 January 2024, retrieved on 10 November 2026. The figures in the example are assumed. Only the cited statutory articles were read; standards such as SIA 118 and collective agreements, which may regulate Regie rates or surcharges, were not. This article does not replace legal advice: whether an overrun is «disproportionate» is decided by the court in each case.